Bouguer correction
filippomuccini
Posts: 2
in Oasis montaj
Hi, I have to calculate the Bouguer Anomaly for a shipborne survey. The elevation channel must be equal to the bathymetry and must be positive?
I.e., water depth 500 m bsl = + 500 in the elevation channel
I.e., water depth 500 m bsl = + 500 in the elevation channel
Tagged:
0
This discussion has been closed.
Categories
- All Categories
- 311 Community
- 3 Get Started
- 18 Latest Releases
- 17 Member Spotlight
- 42 Learning
- 1.1K Products
- 567 Geology
- 540 Leapfrog
- 1 Volsung
- 26 Visible Geology
- 36 Data Management & Collaboration
- 14 MX Deposit
- 13 Central
- 9 Imago
- 138 Geotechnical
- 138 GeoStudio
- 334 Geophysics
- 323 Oasis montaj
- 1 Workbench
- SPIA
- 10 Res2DInv & Res3DInv
- 3 Evo
- 27 GX Developer