Three Key Challenges in Wind Farm Development
LorraineGodwin
Posts: 94
in Oasis montaj
Three key challenges in wind farm site development are:
1. Unexploded Ordnance (UXO) may be a safety and insurance concern for construction projects.
2. Cable and pipeline routes need to be planned, monitored and modeled.
3. A thorough understanding of the subsurface geotechnical properties are needed before wind turbines and cable routes can be constructed.
@MattGrove @SaraLiseUnderhay and @PhilipSuttak will be at Stand 105 during Wind Energy Hamburg to discuss these challenges and how Geosoft can help.
https://www.geosoft.com/events/windenergy-hamburg-2018
1. Unexploded Ordnance (UXO) may be a safety and insurance concern for construction projects.
2. Cable and pipeline routes need to be planned, monitored and modeled.
3. A thorough understanding of the subsurface geotechnical properties are needed before wind turbines and cable routes can be constructed.
@MattGrove @SaraLiseUnderhay and @PhilipSuttak will be at Stand 105 during Wind Energy Hamburg to discuss these challenges and how Geosoft can help.
https://www.geosoft.com/events/windenergy-hamburg-2018
Lorraine Godwin
Global Business Director
Global Business Director
Tagged:
0
This discussion has been closed.