Three Key Challenges in Wind Farm Development

Three key challenges in wind farm site development are:

1. Unexploded Ordnance (UXO) may be a safety and insurance concern for construction projects.

2. Cable and pipeline routes need to be planned, monitored and modeled.

3. A thorough understanding of the subsurface geotechnical properties are needed before wind turbines and cable routes can be constructed.

@MattGrove @SaraLiseUnderhay and @PhilipSuttak will be at Stand 105 during Wind Energy Hamburg to discuss these challenges and how Geosoft can help.
https://www.geosoft.com/events/windenergy-hamburg-2018
Lorraine Godwin
Global Business Director
Geosoft logo
Tagged:
This discussion has been closed.